O&M |
|
CODE |
ECO |
BEMS
control |
|
FACILITY MANAGEMENT |
|
O1.1 |
Generate instructions (“user guide”) targeted
to the occupants |
|
|
|
O1.2 |
Hire or appoint an energy manager |
|
|
|
O1.3 |
Train building operators in energy – efficient
O&M activities |
|
|
|
O1.4 |
Introduce an energy – efficient objective as a
clause in each O&M contract |
|
|
|
O1.5 |
Introduce benchmarks, metering and tracking as
a clause in each O&M contract, with indication of values
in graphs and tables |
|
|
|
O1.6 |
Update documentation on system / building and
O&M procedures to maintain continuity and reduce
troubleshooting costs |
|
|
|
O1.7 |
Check if O&M staff are equipped with state
– of – the – art diagnostic tools |
|
|
|
|
|
|
|
GENERAL HVAC SYSTEM |
|
O2.1 |
Use an energy accounting system to locate
savings opportunities and to track and measure the success of
energy – efficient strategies |
Y |
|
|
O2.2 |
Shut off A/C equipments when not needed |
Y |
|
|
O2.3 |
Shut off auxiliaries when not required |
Y/N |
|
|
O2.4 |
Maintain proper system control set
points |
Y |
|
|
O2.5 |
Adjust internal set point values to external
climatic conditions |
Y |
|
|
O2.6 |
Implement pre-occupancy cycle |
Y |
|
|
O2.7 |
Sequence heating and cooling |
Y |
|
|
O2.8 |
Adopt variable speed control strategy |
Y |
|
|
|
|
|
|
COOLING EQUIPMENT |
|
O3.1 |
Shut chiller plant off when not
required |
Y |
|
|
O3.2 |
Sequence operation of multiple units |
Y |
|
|
O3.3 |
Operate chillers or compressors in series or
parallel |
|
|
|
O3.4 |
Track and optimize chillers operation
schedule |
Y |
|
|
O3.5 |
Maintain proper starting frequency and running
time of (reversible) chillers |
Y |
|
|
O3.6 |
Improve part load operation control |
Y |
|
|
O3.7 |
Maintain proper evaporating and condensing
temperatures |
Y |
|
|
O3.8 |
Raise chilled water temperature and suction
gas pressure |
Y |
|
|
O3.9 |
Lower condensing water temperature and
pressures |
Y |
|
|
O3.10 |
Check sensor functioning and placement for
(reversible) chillers |
Y |
|
|
O3.11 |
Maintain efficient defrosting (reversible
chillers) |
Y |
|
|
O3.12 |
Maintain proper heat source/sink flow
rates |
Y |
|
|
O3.13 |
Maintain functioning of (reversible) chiller
expansion device |
Y |
|
|
O3.14 |
Check (reversible) chiller stand-by
losses |
Y |
|
|
O3.15 |
Maintain full charge of refrigerant |
Y/N |
|
|
O3.16 |
Clean finned tube evaporator / condenser air
side and straighten damaged fins |
|
|
|
O3.17 |
Clean condenser tubes periodically |
|
|
|
O3.18 |
Repair or upgrade insulation on chiller |
|
|
|
O3.19 |
Clean and maintain cooling tower circuits and
heat exchanger surfaces |
|
|
|
O3.20 |
Apply indirect free cooling using the existing
cooling tower (free chilling) |
Y |
|
|
|
|
|
|
FLUID (AIR AND WATER) HANDLING AND DISTRIBUTION |
|
O4.1 |
Consider modifying the supply air temperature
(all–air and air–and–water systems) |
Y |
|
|
O4.2 |
Perform night time overventilation |
Y |
|
|
O4.3 |
Shut off coil circulators when not
required |
Y |
|
|
O4.4 |
Replace mixing dampers |
|
|
|
O4.5 |
Adjust fan belts (AHU, packaged
systems) |
|
|
|
O4.6 |
Eliminate air leaks (AHU, packaged
systems) |
|
|
|
O4.7 |
Increase outdoor air flow rate (direct free
cooling) |
Y |
|
|
O4.8 |
Adjust/balance ventilation system |
Y |
|
|
O4.9 |
Reduce air flow rate to actual needs |
Y/N |
|
|
O4.10 |
Check maintenance protocol in order to reduce
pressure losses |
|
|
|
O4.11 |
Reduce air leakage in ducts |
|
|
|
O4.12 |
Clean fan blades |
|
|
|
O4.13 |
Maintain drives |
|
|
|
O4.14 |
Clean or replace filters regularly |
|
|
|
O4.15 |
Repair/upgrade duct, pipe and tank
insulation |
|
|
|
O4.16 |
Consider the possibility to increase the water
outlet – inlet temperature difference and reduce the flow rate
for pumping power reduction |
|
|
|
O4.17 |
Balance hydronic distribution system |
Y |
|
|
O4.18 |
Bleed air from hydronic distribution
system |
Y |
|
|
O4.19 |
Switch off circulation pumps when not
required |
Y |
|
|
O4.20 |
Maintain proper water level in expansion
tank |
Y |
|
|
O4.21 |
Repair water leaks |
|
|
|
O4.22 |
Reduce water flow rates to actual needs |
Y/N |
|